Today, at the Government House, a contract will be signed for the design and construction of the Moldovan section of the 400 kV Balti-Suceava power line, the second of three lines connecting the country to the European ENTSO-E grid. Technical studies for this project have been under discussion since 2017, but it was only the EBRD loan, ratified in April 2024, that turne......